PIPING CONSTRUCTION QUALITY MANAGEMENT DETAIL RULES

已有 249 次阅读2013-9-5 07:20

管道工程施工质量管理工作细则

PIPING CONSTRUCTION QUALITY MANAGEMENT DETAIL RULES

 

目录

Content

 

1.0                编制目的及适用范围

Purpose for Preparation and Scope of Application

 

2.0            编制原则

Principles for Preparation

 

3.0            执行标准及有关规定

Applicable Standards and Relevant Regulations

 

3.1            中国政府的相关法规和政策

Relevant laws, regulations and policies issued by Chinese government:

 

3.2            SECCO项目IPMT质量体系有关文件

Documentation related to IPMT quality system of SECCO project:

 

3.3            SECCO项目IPMT规定和要求

IPMT regulations and requirements of SECCO project:

 

3.4            施工验收标准及规范

Standards and codes for construction acceptance:

 

4.0            冲突和协调

Conflict and Coordination

 

5.0            专业技术经理与专业工程师

Specialist Technical Manager and Specialist Engineer

 

5.1            专业技术经理

Specialist technical manager

 

5.2                专业工程师

Specialist engineer

 

6.0                HSE

 

7.0            施工过程中工程施工质量的控制

Quality Control in the Process of Construction

 

7.1            主要依据

Main basis

 

7.2            熟悉现场管理体系、建立工作接口

Acquaintance with site management system and establishment of working interface

 

7.3            技术准备

Technical Preparations

 

7.4            组织设计交底

Organization Design Briefing

 

7.5            图纸与设计文件会审

Joint Check-up of Drawings and Design Documents

 

7.6            审查施工组织设计和施工方案

Check-up of Construction Organization Design and Construction Plan

 

7.7            施工过程的质量控制点的制定和检查程序

Procedures for the Establishment and Inspection of Quality Control Points in the Construction Process

 

7.8            施工过程中的质量控制

                     Quality Control During the Construction Process

 

7.8.1           原材料的检查与验收原则

                     Principles for the Inspection and Verification of Raw Materials

 

7.8.2             管子抽检的内容和比例

Contents and Percentage of Pipe Spot-check

 

7.8.3           其他管道组成件抽检的内容和比例

                     Spot-check Contents and Percentage of Other Pipe Components

 

7.8.4           阀门的检验与试验(包括管道视镜、过滤器及阻火器检验)

Valve Inspection and Experiment (Including the inspection of pipe signt glass, strainer and flame arrestor)

 

7.8.5             采用的主要管道器材标准(规范)

Major Piping Specifications Standards (or codes)

 

7.8.5.1          材料标准  

Material Standards

 

7.8.5.1.1              无缝钢管

Seamless Steel Pipe

 

7.8.5.1.2              焊接钢管

Welded Steel Pipe

 

7.8.5.1.3              管件

Pipe fittings

 

7.8.5.1.4              联接件

Pipe joints

 

7.8.5.1.5              阀门

Valves

 

7.8.5.2          应用规范

Application specification

 

7.8.5.2.1              管子

Pipe

 

7.8.5.2.2              管件

Pipe fittings

 

7.8.5.2.3      联接件

Pipe joints

 

7.8.5.2.4              阀门

Valves

 

7.8.6            管道防腐

Pipingcorrosion prevention

 

7.8.7            管道的预制加工工艺

Pre-fabrication process for pipe

 

7.8.8           碳素钢管道焊接、热处理及质量检查

Welding, heat treatment and quality inspection for carbon steel pipe

 

7.8.9        阀门安装

Valve installation

 

7.8.10                低温材料检验及安装

Cryogenic material inspection and installation

 

7.8.11       静电接地安装

Static grounding erection

 

7.8.12       管道系统试验、吹除与清洗

Test, purging and cleaning for piping system

 

7.8.13       工程中间交接

Engineering intermediate takeover

 

7.8.14       竣工验收

Completion acceptance

 

7.9          专业工程师应保存的资料

Documents to be retained by specialist engineer

 

 

 

附录1:                  管道安装工程质量控制点

Appendix 1      Quality Control Points for Piping Installation Project

 

附录2                工业管道施工管理台帐

Appendix 2           Industrial Piping Construction Management Record Book